Lower Change Failure Rate
Engineering practices to systematically reduce failed production changes.
Challenge
Unpredictable rollbacks erode stakeholder trust.
Our Approach
Smaller batch sizes, pre-deploy validation, feature flags, and blameless postmortems feeding learning loops.
Key Outcomes
- Greater stability
- Predictable delivery
- Reduced firefighting
Core KPIs
- Change Failure Rate
- Rollback Time
- Escaped Defects